SAFE WORK METHOD STATEMENT (Tilt-up & Precast Panel Erection)
Authorized By: _________________________

Rev: 1 04/06/2025
Logo Placeholder
COMPANY DETAILS
Name: XXX ABN: XXX Address: XXX
TASK NAME / ACTIVITY Tilt-up & Precast Panel Erection
SITE / PROJECT NAME XXX
CODES OF PRACTICE
Abrasive blasting Construction work Formwork
Managing risks of falls at workplaces Managing the risks of plant in the workplace Managing the risks of silica in engineered stone workplaces
PERSONAL PROTECTIVE EQUIPMENT
Hard Hat

Hard Hat
High Vis Clothing

High Vis Clothing
Safety Glasses

Safety Glasses
Respiratory Protection

Respiratory Protection
Face Shield

Face Shield
Safety Boots

Safety Boots
Safety Gloves

Safety Gloves
Hearing Protection

Hearing Protection

Other
HIGH RISK CONSTRUCTION WORK
Risk of a person falling more than 2 metres Work on a telecommunication tower Demolition of load-bearing structure
Likely to involve disturbing asbestos Work on or near pressurised gas mains or piping Work in or near a confined space
Work in or near a shaft or trench deeper than 1.5m or a tunnel Use of explosives Temporary load-bearing support for structural alterations or repairs
Work in or near water or liquid that involves a risk of drowning Work on or near energised electrical installations or services Work that may have a contaminated or flammable atmosphere
Tilt-up or precast concrete elements Diving work Work in an area with movement of powered mobile plant
Work in areas with artificial extremes of temperature Work on or near chemical, fuel or refrigerant lines Work on, in or adjacent to a road, railway, shipping lane or other traffic corridor in use by traffic other than pedestrians
Job / Task Hazards / Risks Initial Risk Control Measures Residual Risk Responsibility
Cranage Operation Falling Objects C Ensure All Panel Lifters are Installed and sign off by Engineer.
Ensure Connection point of Panels to Cranes are Secure and operating Correctly
Ensure Clearance away from Areas where panels are being lifted over at all times
Medium All On Site
Crane Failure / Tipping C Ensure the Hardstand platform for the crane is stable and will not move under the weight of the crane.
Ensure the crane is able to handle the required weight to reach ratio
Maintain Clear Distance from Cthe rane during lift process, particularly avoid standing near the direction the crane arm is extended out to.
Medium All On Site
Falls From heights Workers may fall during panel installation or while working on elevated platforms. High Implement fall protection systems, such as guardrails or personal fall arrest systems.

Provide adequate training on working at heights.

Ensure safe access to elevated work areas.
Medium Operators of EWP
Manual Handling Injuries Lifting or moving heavy materials can cause musculoskeletal injuries. High Use mechanical aids where possible.

Train workers in proper lifting techniques.

Plan tasks to minimize manual handling.
Low All
Electrical Hazards Contact with overhead or underground power lines during lifting operations. High Identify and mark all electrical hazards before commencing work.

Maintain safe distances from power lines.

Use spotters when operating cranes near electrical hazards.
Low Anyone working near electrical hazards
Panel Collapse or Toppling Panels may collapse due to inadequate bracing or premature removal of supports. C Ensure temporary bracing is designed and certified by a qualified engineer.

Do not remove braces until all permanent structural connections are secured.

Regularly inspect braces for integrity and proper installation.
Medium Panel Installers, Site Manager
Weather Conditions Adverse weather, such as high winds or rain, can affect lifting operations and panel stability. High Monitor weather forecasts and conditions continuously.

Suspend operations during unsafe weather conditions.

Secure panels and equipment against potential weather impacts.
Low All on Site - Site Manager / project manager
Exposure to Silica Dust Cutting or grinding concrete panels can release respirable crystalline silica. High Use wet cutting methods or dust extraction systems.

Provide appropriate respiratory protective equipment (RPE).

Train workers on the risks associated with silica exposure.
Low All People Cutting or Grinding Concrete Panels
Inadequate Communication Miscommunication can lead to accidents during complex operations. High Establish clear communication channels, such as radios or hand signals.

Ensure all team members understand and use the communication protocols.

Conduct pre-task meetings to discuss roles and responsibilities.
Medium All
Worker Sign off Worker Sign off
Name: Signature: Name: Signature:
Name: Signature: Name: Signature:
Name: Signature: Name: Signature:
Name: Signature: Name: Signature:
Name: Signature: Name: Signature:
Name: Signature: Name: Signature:
Name: Signature: Name: Signature:
Name: Signature: Name: Signature:
Name: Signature: Name: Signature:
Name: Signature: Name: Signature:
Reference Documents