SAFE WORK METHOD STATEMENT (Tilt-up & Precast Panel Erection) Authorized By: _________________________
Rev: 1 04/06/2025 |
Logo Placeholder |
| COMPANY DETAILS | ||
| Name: XXX | ABN: XXX | Address: XXX |
| TASK NAME / ACTIVITY | Tilt-up & Precast Panel Erection |
| SITE / PROJECT NAME | XXX |
| CODES OF PRACTICE | ||
| Abrasive blasting | Construction work | Formwork |
| Managing risks of falls at workplaces | Managing the risks of plant in the workplace | Managing the risks of silica in engineered stone workplaces |
| PERSONAL PROTECTIVE EQUIPMENT | ||||||||
|
|
|
|
|
|
|
|
|
|
| HIGH RISK CONSTRUCTION WORK | ||
| Risk of a person falling more than 2 metres | Work on a telecommunication tower | Demolition of load-bearing structure |
| Likely to involve disturbing asbestos | Work on or near pressurised gas mains or piping | Work in or near a confined space |
| Work in or near a shaft or trench deeper than 1.5m or a tunnel | Use of explosives | Temporary load-bearing support for structural alterations or repairs |
| Work in or near water or liquid that involves a risk of drowning | Work on or near energised electrical installations or services | Work that may have a contaminated or flammable atmosphere |
| Tilt-up or precast concrete elements | Diving work | Work in an area with movement of powered mobile plant |
| Work in areas with artificial extremes of temperature | Work on or near chemical, fuel or refrigerant lines | Work on, in or adjacent to a road, railway, shipping lane or other traffic corridor in use by traffic other than pedestrians |
| Job / Task | Hazards / Risks | Initial Risk | Control Measures | Residual Risk | Responsibility |
|---|
| Cranage Operation | Falling Objects | C |
Ensure All Panel Lifters are Installed and sign off by Engineer. Ensure Connection point of Panels to Cranes are Secure and operating Correctly Ensure Clearance away from Areas where panels are being lifted over at all times |
Medium | All On Site |
| Crane Failure / Tipping | C |
Ensure the Hardstand platform for the crane is stable and will not move under the weight of the crane. Ensure the crane is able to handle the required weight to reach ratio Maintain Clear Distance from Cthe rane during lift process, particularly avoid standing near the direction the crane arm is extended out to. |
Medium | All On Site |
| Falls From heights | Workers may fall during panel installation or while working on elevated platforms. | High |
Implement fall protection systems, such as guardrails or personal fall arrest systems. Provide adequate training on working at heights. Ensure safe access to elevated work areas. |
Medium | Operators of EWP |
| Manual Handling Injuries | Lifting or moving heavy materials can cause musculoskeletal injuries. | High |
Use mechanical aids where possible. Train workers in proper lifting techniques. Plan tasks to minimize manual handling. |
Low | All |
| Electrical Hazards | Contact with overhead or underground power lines during lifting operations. | High |
Identify and mark all electrical hazards before commencing work. Maintain safe distances from power lines. Use spotters when operating cranes near electrical hazards. |
Low | Anyone working near electrical hazards |
| Panel Collapse or Toppling | Panels may collapse due to inadequate bracing or premature removal of supports. | C |
Ensure temporary bracing is designed and certified by a qualified engineer. Do not remove braces until all permanent structural connections are secured. Regularly inspect braces for integrity and proper installation. |
Medium | Panel Installers, Site Manager |
| Weather Conditions | Adverse weather, such as high winds or rain, can affect lifting operations and panel stability. | High |
Monitor weather forecasts and conditions continuously. Suspend operations during unsafe weather conditions. Secure panels and equipment against potential weather impacts. |
Low | All on Site - Site Manager / project manager |
| Exposure to Silica Dust | Cutting or grinding concrete panels can release respirable crystalline silica. | High |
Use wet cutting methods or dust extraction systems. Provide appropriate respiratory protective equipment (RPE). Train workers on the risks associated with silica exposure. |
Low | All People Cutting or Grinding Concrete Panels |
| Inadequate Communication | Miscommunication can lead to accidents during complex operations. | High |
Establish clear communication channels, such as radios or hand signals. Ensure all team members understand and use the communication protocols. Conduct pre-task meetings to discuss roles and responsibilities. |
Medium | All |
| Worker Sign off | Worker Sign off | ||
|---|---|---|---|
| Name: | Signature: | Name: | Signature: |
| Name: | Signature: | Name: | Signature: |
| Name: | Signature: | Name: | Signature: |
| Name: | Signature: | Name: | Signature: |
| Name: | Signature: | Name: | Signature: |
| Name: | Signature: | Name: | Signature: |
| Name: | Signature: | Name: | Signature: |
| Name: | Signature: | Name: | Signature: |
| Name: | Signature: | Name: | Signature: |
| Name: | Signature: | Name: | Signature: |