|
SAFE WORK METHOD STATEMENT (Gas Metal Arc Welding (MIG)) Authorized By: _________________________
Rev: 1 09/12/2024 |
Logo Placeholder |
| COMPANY DETAILS | ||
| Name: XXX | ABN: XXX | Address: XXX |
| TASK NAME / ACTIVITY | Gas Metal Arc Welding (MIG) |
| SITE / PROJECT NAME | XXX |
| CODES OF PRACTICE | ||
| How to manage work health and safety risks | Managing electrical risks | Managing psychosocial hazards at work |
| Managing risks of hazardous chemicals in the workplace | Welding processes | Work health and safety consultation, cooperation and coordination |
| PERSONAL PROTECTIVE EQUIPMENT | ||||||||
|
|
|
|
|
|
|
|
|
|
| HIGH RISK CONSTRUCTION WORK | ||
| Risk of a person falling more than 2 metres | Work on a telecommunication tower | Demolition of load-bearing structure |
| Likely to involve disturbing asbestos | Work on or near pressurised gas mains or piping | Work in or near a confined space |
| Work in or near a shaft or trench deeper than 1.5m or a tunnel | Use of explosives | Temporary load-bearing support for structural alterations or repairs |
| Work in or near water or liquid that involves a risk of drowning | Work on or near energised electrical installations or services | Work that may have a contaminated or flammable atmosphere |
| Tilt-up or precast concrete elements | Diving work | Work in an area with movement of powered mobile plant |
| Work in areas with artificial extremes of temperature | Work on or near chemical, fuel or refrigerant lines | Work on, in or adjacent to a road, railway, shipping lane or other traffic corridor in use by traffic other than pedestrians |
| Job / Task | Hazards / Risks | Initial Risk | Control Measures | Residual Risk | Responsibility |
|---|
| Operator Requirements | Personal Injury and Fire Risks | High |
Ensure all workers are qualified and experienced. Provide training in: - Company OH&S induction - Construction OH&S induction - Site-specific induction Include training on: - Safe work procedures - Hazard identification - SDS for shielding gas and electrodes - Correct PPE use - Emergency management procedures |
Medium | Site Supervisor |
| Worker Sign off | Worker Sign off | ||
|---|---|---|---|
| Name: | Signature: | Name: | Signature: |
| Name: | Signature: | Name: | Signature: |
| Name: | Signature: | Name: | Signature: |
| Name: | Signature: | Name: | Signature: |
| Name: | Signature: | Name: | Signature: |
| Name: | Signature: | Name: | Signature: |
| Name: | Signature: | Name: | Signature: |
| Name: | Signature: | Name: | Signature: |
| Name: | Signature: | Name: | Signature: |
| Name: | Signature: | Name: | Signature: |