SAFE WORK METHOD STATEMENT (Carpentry)
Authorized By: _________________________

Rev: 1 06/12/2024
Logo Placeholder
COMPANY DETAILS
Name: XXX ABN: XXX Address: XXX
TASK NAME / ACTIVITY Carpentry
SITE / PROJECT NAME XXX
CODES OF PRACTICE
Construction work Excavation work Hazardous manual tasks
How to manage work health and safety risks Managing electrical risks Managing psychosocial hazards at work
Managing risks of falls at workplaces Managing the risks of plant in the workplace Work health and safety consultation, cooperation and coordination
PERSONAL PROTECTIVE EQUIPMENT
Hard Hat

Hard Hat
High Vis Clothing

High Vis Clothing
Safety Glasses

Safety Glasses
Respiratory Protection

Respiratory Protection
Face Shield

Face Shield
Safety Boots

Safety Boots
Safety Gloves

Safety Gloves
Hearing Protection

Hearing Protection

Other
HIGH RISK CONSTRUCTION WORK
Risk of a person falling more than 2 metres Work on a telecommunication tower Demolition of load-bearing structure
Likely to involve disturbing asbestos Work on or near pressurised gas mains or piping Work in or near a confined space
Work in or near a shaft or trench deeper than 1.5m or a tunnel Use of explosives Temporary load-bearing support for structural alterations or repairs
Work in or near water or liquid that involves a risk of drowning Work on or near energised electrical installations or services Work that may have a contaminated or flammable atmosphere
Tilt-up or precast concrete elements Diving work Work in an area with movement of powered mobile plant
Work in areas with artificial extremes of temperature Work on or near chemical, fuel or refrigerant lines Work on, in or adjacent to a road, railway, shipping lane or other traffic corridor in use by traffic other than pedestrians
Job / Task Hazards / Risks Initial Risk Control Measures Residual Risk Responsibility
Accessing site and starting work Traffic hazards High Signage, flagging or delineation of work
zone.
Workers to be aware of traffic hazards.
Medium All workers
Contact with services High Maintain exclusion zones around powerlines.
Use spotters if necessary.
DBYD and ensure underground services are
protected prior to excavation.
Medium All workers
Slips, trips and falls High Good housekeeping.
Wear non-slips shoes.
Pay attention when walking.
Medium All workers
Sunburn / dehydration High Sun protection (broadbrimmed hard hat,
sunscreen, long-sleeve clothing).
Drink plenty of water.
Avoid excessive caffeine.
Low All workers
Electrical hazards High Testing and tagging of electrical equipment.
Run leads in a safe manner.
Inspect electrical equipment before use.
RCDs in use.
Low All workers
Noise hazards Medium Hearing protection to be worn if noise levels
over 85dBA.
Ensure loud plant or equipment is positioned
away from workers, if possible.
Low All workers
Chemical hazards Medium Up to date SDS register available for all
hazardous substances.
All safety controls in place as per SDS.
All spills to be reported to supervisor.
Refer to SDS for chemical properties and
storage/handling procedures.
Low All workers
Conducting carpentry work Falls / injuries caused during carpentry works High For works over 2m high (or 3m high in
residential construction with roof pitch less
than 26°), personnel are to ensure there is
something physically stopping the worker
from falling, e.g.:
- Conducting the work off a solid construction
- Using a fall prevention device (handrails
etc.)
- Conducting the work from a work platform
- Using a fall restraint system
- Using a fall arrest system.
Staff are to be trained and competent in the
use of safety equipment and procedures for
working at heights (working at heights
training may be required).
Working at heights gear is to be fit for
purpose and tested / tagged (if required).
For works under 2m high, risks are to be
assessed and managed.
When working from ladders workers need to
remember:
- Only industrial ladders are to be used
- Work from the top 2 rungs of a ladder is not
permitted
- Ladders and other working at heights
equipment are to be inspected prior to use
- Workers are to never lean or conduct heavy
work off a ladder.
Medium All workers
Falling objects High Personnel need to pay attention to signs and
do not enter any exclusion zones established
on site.
All workers are to wear correct PPE.
Medium All workers
Improper Use of Trestles High When using trestles, workers must:
Conduct a thorough inspection of trestles for any damage or defects before use.
Secure trestles on a stable and level surface to prevent tipping.
Utilize handrails or harnesses as necessary for additional safety.
Adhere to weight capacity guidelines to avoid overloading trestles.
Medium All workers
Improper Use of Mobile Scaffold High When working with mobile scaffolds, workers must:
Inspect the scaffold for any damage prior to use.
Lock the wheels to prevent any unintended movement.
Utilize guardrails and platforms as necessary for safety.
Avoid overloading and strictly adhere to weight limits.
Medium All workers
Incorrect Installation of Scaffolding High Ensure:
It is constructed by competent workers (a high-risk license is required if the scaffold exceeds 4 meters).
The scaffold is fit for its intended purpose.
It is placed on stable ground.
It is equipped with guardrails, mid rails, and toe boards.
Safe access is provided.

caffolds identified as unsafe must be locked or tagged out. A competent person must inspect scaffolds before use:
Following any alterations or repairs
After events like high winds, storms, impacts, or unauthorized modifications that could compromise integrity or stability
At regular intervals, not exceeding 30 days.
Medium All workers
Use of Plant and Machinery - Crush injuries, Plant collisions, Plant rollovers High Workers must maintain a safe distance from plant and machinery. Only competent and authorized personnel are permitted to operate them.
Prohibited Actions:
Lifting loads or attachments over workers
Riding on machinery (unless in approved seating)
Operating machinery under the influence of drugs or alcohol
Using a phone while operating plant or machinery
Ensure plant exclusion zones are established and enforced. Use spotters as needed.
Medium All workers
Excavations - Contact with underground services, Unauthorised access, Trench collapse High Before starting excavation work, personnel must ensure:
Underground services are identified and marked using DBYD or service locators.
Exclusion zones are set up according to the located services.
If it's not possible to locate and mark all services, a full-time competent spotter should accompany the plant at all times.
Unauthorized access near trenches must be prevented with barricades, fencing, and signage.
Before entering a trench over 1.5 meters deep, workers must ensure:
They have authorization, such as an excavation permit.
Battering, benching, or shoring is in place.
Safe access is available.
Medium All workers
Improper Handling of Lifting Equipment High Verify equipment approval and suitability.
Conduct testing and tagging of gear.
Set up exclusion zones.
Inspect gear before use.
Prohibited:
Exceeding safe weight limits.
Standing beneath suspended loads.
Use taglines when needed.
Medium All workers
Injuries from Hand and Power Tools Medium Ensure workers are trained and competent in tool use.
Inspect tools and cords for damage before use.
Test and tag all electrical leads.
Low All workers
Plant or Equipment Malfunction Medium Complete pre-start checks.
Ensure all guarding is in place and suitable.
Report any faults to a supervisor.
Low All workers
Incompetence with Plant/Equipment Medium Only allow competent and authorized personnel to perform tasks. Low All workers
Plant Operation High Restrict tasks to competent and authorized personnel.
Implement and enforce exclusion zones.
Use spotters when necessary.
Medium All workers
Eye Injuries Medium Restrict tasks to competent and authorized personnel.
Ensure safety glasses are worn.
Maintain all guarding.
Low All workers
Hand Injuries Medium Restrict tasks to competent and authorized personnel.
Maintain all guarding.
Wear appropriate gloves.
Low All workers
Flying Debris Medium Wear safety glasses (double eye protection for welding/grinding).
Establish exclusion zones around hazardous areas.
Low All workers
Silica Exposure Medium Wet down areas to minimize dust.
Use dust extraction on equipment if available.
Wear respiratory PPE if dust levels are uncontrolled.
Low All workers
Manual Handling Injuries Medium Ensure all personnel are inducted.
Use proper posture and handling techniques.
Utilize mechanical devices.
Implement team lifting.
Low All workers
Finishing Task / Packing Up Equipment Damage During Shift Medium Report and tag out damaged equipment to a supervisor. Low All workers
Unauthorized Site Access Medium Secure gates and fences before leaving the site. Low All workers
Slip, Trip, and Fall Risks High Store tools and equipment properly.
Dispose of all rubbish in bins.
Low All workers
Handling Hazardous Materials Medium Store hazardous substances and flammables safely. Low All workers
Worker Sign off Worker Sign off
Name: Signature: Name: Signature:
Name: Signature: Name: Signature:
Name: Signature: Name: Signature:
Name: Signature: Name: Signature:
Name: Signature: Name: Signature:
Name: Signature: Name: Signature:
Name: Signature: Name: Signature:
Name: Signature: Name: Signature:
Name: Signature: Name: Signature:
Name: Signature: Name: Signature:
Reference Documents